Resources
Everything we'd tell you in person, in writing.
Two free guides, straight answers to the questions we hear most, and the vocabulary that shows up in every contract.
Free guides
Take one with you.
A name and an email, and the PDF downloads immediately. No sales call.
Homeowner FAQ
The questions we answer most.
Glossary
The words builders use.
If a term in your contract isn't here, ask. We'd rather explain it than have you nod along.
- Change order
- A written, signed change to the scope, price, or schedule after the contract is signed.
- Draw
- A payment released when a defined stage of work is finished.
- Dry-in
- The point where the roof and windows are on and the house is closed against weather.
- Footing
- The widened concrete base that carries a foundation wall.
- Perc test
- A soil test that measures how quickly water drains, used to size a septic system.
- Punch list
- The final list of small fixes made before you take possession.
- Rough-in
- Electrical, plumbing, and HVAC lines run inside the walls before drywall.
- Setback
- The distance a building must sit back from the property line.
- Certificate of occupancy
- The town's sign-off that the building is legal to live in.
Before you hire anyone
Questions to ask any builder.
Ask these of us, too. A good builder answers all eight without flinching.
- 01Can I see the price in writing, line by line, before I sign?
- 02Who pulls the permits, and who meets the inspector?
- 03Who is on site day to day, and how do I reach them?
- 04How do change orders work, and what do they cost?
- 05What is held back until the final walkthrough?
- 06What does your warranty cover, and for how long?
- 07Can I speak with two clients from the last year?
- 08What happens if the schedule slips — who tells me, and when?
Free consultation
Ready to start? Book your free consultation.
Tell us about the property and what you're hoping to build. We answer every request within one business day.