Our process

The same seven steps, on every job.

Written down so you always know where you are, what happens next, and who is responsible for it.

Step by step

From first phone call to warranty visit.

  1. 01

    Free consultation

    We meet at the property, listen to what you want, and look at what's already there.

  2. 02

    Feasibility and budget

    Zoning, septic, and structure checked first, then an honest range before design.

  3. 03

    Design and selections

    Drawings and finishes, gathered into a written scope you can actually read.

  4. 04

    Written proposal

    Line-item price, timeline, and payment schedule. Signed before anyone lifts a hammer.

  5. 05

    Permits and approvals

    We file, follow up, and schedule the inspections the town requires.

  6. 06

    Construction

    Weekly updates, signed change orders, a clean site, and a crew that shows up.

  7. 07

    Walkthrough and warranty

    Punch list, final inspection, and a warranty visit after you move in.

On site

The eight stages of construction.

This is the sequence inside step six. Each stage ends with an inspection or a sign-off before the next begins.

Fig. 02 — The eight stages of a build

01

Permits & site prep

Approvals in hand, lot staked, driveway and erosion controls in place.

02

Foundation

Footings, walls, waterproofing, and the first inspection signed off.

03

Framing

Walls, floors, and roof structure set and braced.

04

Roof & windows

Dry-in: the house closes against the weather.

05

Rough trades

Electrical, plumbing, and HVAC run before the walls close.

06

Insulation & drywall

Sealed, insulated, inspected, then hung and finished.

07

Finishes

Cabinets, tile, trim, paint, and fixtures.

08

Final inspection

Punch list, certificate of occupancy, and your walkthrough.

Payments

When money changes hands.

Payments follow completed work, not the calendar. Nothing is paid ahead of a stage that's finished.

  1. 01

    Contract signing

    Deposit, used for permits, drawings, and material ordering.

  2. 02

    Foundation complete

    First draw, after inspection.

  3. 03

    Framing and dry-in

    Second draw, when the house is closed against weather.

  4. 04

    Rough trades and insulation

    Third draw, after rough inspections pass.

  5. 05

    Finishes

    Fourth draw, at cabinet and finish stage.

  6. 06

    Final walkthrough

    Final payment, held until the punch list is done.

Change orders

Nothing gets added quietly.

If you want something different, we price it in writing: what it adds, what it removes, and what it does to the schedule. You sign before we build it. If you don't sign, the job carries on as originally planned.

The same rule runs the other way. If we find something the drawings didn't show — rotted framing, an undersized beam — you hear it from us before anyone spends your money on it.

Timeline

How long each kind of job takes.

1–3 weeks

Repair list

From approval to finished work, for typical inspection items.

4–7 months

Addition

Design and permits included, for a suite or family room.

7–10 months

Second story

Structural work and a temporary roof add time.

12–16 months

Custom home

From signed proposal to your walkthrough.

Free consultation

Want to walk through this in person?

The best way to understand the process is to see a job in progress. Ask and we'll show you one.