Our process
The same seven steps, on every job.
Written down so you always know where you are, what happens next, and who is responsible for it.
Step by step
From first phone call to warranty visit.
- 01
Free consultation
We meet at the property, listen to what you want, and look at what's already there.
- 02
Feasibility and budget
Zoning, septic, and structure checked first, then an honest range before design.
- 03
Design and selections
Drawings and finishes, gathered into a written scope you can actually read.
- 04
Written proposal
Line-item price, timeline, and payment schedule. Signed before anyone lifts a hammer.
- 05
Permits and approvals
We file, follow up, and schedule the inspections the town requires.
- 06
Construction
Weekly updates, signed change orders, a clean site, and a crew that shows up.
- 07
Walkthrough and warranty
Punch list, final inspection, and a warranty visit after you move in.
On site
The eight stages of construction.
This is the sequence inside step six. Each stage ends with an inspection or a sign-off before the next begins.
Fig. 02 — The eight stages of a build
Permits & site prep
Approvals in hand, lot staked, driveway and erosion controls in place.
Foundation
Footings, walls, waterproofing, and the first inspection signed off.
Framing
Walls, floors, and roof structure set and braced.
Roof & windows
Dry-in: the house closes against the weather.
Rough trades
Electrical, plumbing, and HVAC run before the walls close.
Insulation & drywall
Sealed, insulated, inspected, then hung and finished.
Finishes
Cabinets, tile, trim, paint, and fixtures.
Final inspection
Punch list, certificate of occupancy, and your walkthrough.
Payments
When money changes hands.
Payments follow completed work, not the calendar. Nothing is paid ahead of a stage that's finished.
- 01
Contract signing
Deposit, used for permits, drawings, and material ordering.
- 02
Foundation complete
First draw, after inspection.
- 03
Framing and dry-in
Second draw, when the house is closed against weather.
- 04
Rough trades and insulation
Third draw, after rough inspections pass.
- 05
Finishes
Fourth draw, at cabinet and finish stage.
- 06
Final walkthrough
Final payment, held until the punch list is done.
Change orders
Nothing gets added quietly.
If you want something different, we price it in writing: what it adds, what it removes, and what it does to the schedule. You sign before we build it. If you don't sign, the job carries on as originally planned.
The same rule runs the other way. If we find something the drawings didn't show — rotted framing, an undersized beam — you hear it from us before anyone spends your money on it.
Timeline
How long each kind of job takes.
1–3 weeks
Repair list
From approval to finished work, for typical inspection items.
4–7 months
Addition
Design and permits included, for a suite or family room.
7–10 months
Second story
Structural work and a temporary roof add time.
12–16 months
Custom home
From signed proposal to your walkthrough.
Free consultation
Want to walk through this in person?
The best way to understand the process is to see a job in progress. Ask and we'll show you one.