Build a home

A house drawn for your lot, your family, and your budget.

We build custom homes across New York State, from a first sketch to the day you get your keys. No surprises, no vague numbers.

Who it's for

You're ready to build, and you want it done properly.

This is the right fit if

  • You own land, or you're close to buying it.
  • You want a house planned around how you actually live.
  • You'd rather hear a hard number now than a surprise later.
  • You want one company accountable from permits to warranty.

What's included

  • ✓A design that fits your lot, your setbacks, and your budget
  • ✓Septic, well, and utility planning before the first drawing
  • ✓Line-item written proposal and a payment schedule
  • ✓Permits filed and inspections met by us
  • ✓One crew on site, and a weekly written update
  • ✓Final walkthrough and a warranty visit after you move in

Sample plan

A starting point, not a template.

Here's a 1,860 sq ft three-bedroom plan we use to start conversations. Most clients change the kitchen, the mudroom, or the primary bath — that's the point of building.

GREAT ROOM22' x 18'KITCHEN14' x 11'BATH8' x 11'DINING23' x 7'BED 115' x 12'BED 214' x 12'BED 316' x 12'46'-0"34'-0"SAMPLE PLAN · 1,860 SQ FT · 3 BED / 2 BATH
Fig. 01 — Sample three-bed plan · 1,860 sq ft · dimensions approximate

What you can change: room sizes, the kitchen layout, ceiling heights, window placement, siding, roof pitch, and where the house sits on the lot.

What we draw for you: a site plan, floor plans, elevations, and a written scope of finishes — enough to get permits and enough for you to picture the finished house.

If you already have an architect: we build from their drawings. We'll read them before we price them and tell you what we see.

Typical timeline

About 12 to 16 months, from first meeting to keys.

Weather, town approvals, and material lead times move this. You'll always know which phase you're in.

  1. 01

    Design and selections

    Drawings, finishes, and a written scope.

    6–10 weeks
  2. 02

    Permits and site work

    Town approvals, driveway, clearing, and staking.

    4–8 weeks
  3. 03

    Foundation and framing

    Footings through a dry, closed house.

    6–8 weeks
  4. 04

    Trades and finishes

    Rough-ins, insulation, drywall, cabinets, and paint.

    12–16 weeks
  5. 05

    Final inspection

    Punch list, certificate of occupancy, and your walkthrough.

    2–4 weeks

What does it cost?

Honest ranges, before you commit to anything.

These are planning numbers so you can tell whether building is realistic. Your written proposal comes after we walk the lot.

TypeTypical planning rangeWhat to know
Modest custom home$210–$260 / sq ftEfficient plan, standard finishes, straightforward site.
Mid-range custom home$260–$340 / sq ftCustom plan, upgraded kitchen and baths, more detail.
Highly detailed home$340–$450+ / sq ftComplex roof lines, custom millwork, premium finishes.
Site work (separate)Lot dependentClearing, driveway, well, septic, and utility connections.
Planning ranges for budgeting. Not a quote.New York State · prices exclude land, furniture, and financing

Start here

Book a free consultation.

Tell us about the house you want to build

Short answers are fine. We'll call to set a time.

We use what you send only to answer your request and prepare a price. We don't sell it or share it. How we handle your information.

We reply within one business day · Or call (718) 419-6882

What happens next

  1. 1. We call you back within one business day.
  2. 2. We meet at your lot or your current home.
  3. 3. You get an honest range within a week of that meeting.
  4. 4. If it fits, we move to drawings and a written proposal.

No obligation · No pressure · Just numbers

Free consultation

Ready to start? Book your free consultation.

Tell us about the property and what you're hoping to build. We answer every request within one business day.

Call nowFree Consultation