A well-planned addition is cheaper than a bigger house in a market you don't want to leave. Here's how we decide what's possible — and what it costs.
Types of additions
What we build onto an existing house.
Every addition starts with the same question: what does the house already have room for?
| Type | Typical planning range | What to know |
|---|---|---|
| Primary suite | $180k–$320k | Bedroom, bath, and walk-in closet — the most requested addition. |
| Family room / great room | $120k–$240k | Open space off the kitchen; simplest to heat and finish. |
| Second story | $350k–$650k | Structural reinforcement and a temporary roof are part of the job. |
| Kitchen expansion or bump-out | $90k–$200k | Often the cheapest way to gain usable space. |
| In-law or accessory suite | $220k–$400k | Zoning and septic capacity decide whether it's allowed. |
| Garage and mudroom | $110k–$220k | Add storage, a second entry, and a place for boots and gear. |
| Deck, porch, or sunroom | $45k–$140k | Seasonal versus four-season changes the price quickly. |
Before we draw anything
Three things we check first.
Most disappointments on additions come from skipping this step. We don't skip it.
Zoning and setbacks
How close you can build to the lot line, how much of the lot can be covered, and whether the town counts it as an accessory unit.
Septic and well capacity
A bigger house means more wastewater. We check the septic design and the perc results before anyone draws a plan.
Structure and the tie-in
Where the new roof meets the old one, how the foundation connects, and whether the existing framing can carry the load.
Example drawing
A primary suite, drawn onto a real house.
The dashed line is the existing house. Everything solid copper is new construction. This is the level of drawing you see before you commit to a price.
What it includes: new foundation and frost walls, a framed tie-in to the existing roof, a full bath, and a walk-in closet.
What usually changes: whether the old bedroom becomes an office, where the closet sits, and how the roofline meets the house.
Time on site: typically 4 to 6 months for a suite of this size, weather and inspections included.
Living through it
What it's like to stay in the house while we build.
- You keep the kitchen and at least one bathroom for most of the job. We plan the tie-in around that.
- Dust control matters: plastic barriers, zip walls, and a daily sweep on your side of the line.
- Water and power interruptions are scheduled with you, never sprung on you.
- The crew parks where you ask and keeps the driveway passable.
- Some weeks are loud. We tell you which ones in advance.
Straight answer
An addition is disruptive. Anyone who says otherwise hasn't lived through one. What we can promise is a schedule you can see, a site that gets cleaned, and a written change order before anything is added to the price.
Start here
Request an addition consultation.
Tell us about the space you need
Include the town if you know it — we'll check zoning before we call.
Bring to the meeting
- · A rough sketch or a photo of the house from outside.
- · Any survey or septic paperwork you already have.
- · The number you're hoping to stay under.
None of it is required. It just gets you a better answer sooner.